A simheuristic for project portfolio optimization combining individual project risk, scheduling effects, interruptions, and project risk correlations

Otros/as autores/as

Universitat Ramon Llull. Esade

Fecha de publicación

2024



Resumen

This paper introduces a simheuristic method to the Project Portfolio Selection Problem, designed to maximize the net present value of the portfolio while considering uncertain costs, schedules, interruptions, and inter-project risk correlations. The novel approach combines techniques from Monte Carlo simulation, critical path analysis, queuing theory, and optimization, integrating baseline schedules, project-level uncertainties, budgetary constraints, and risk correlations in a single model. A computational experiment is conducted on a realistic set of ten candidate projects and validated respect to the deterministic version of the problem, demonstrating its ability to select near optimal portfolio proposals with varying combinations of risk and net present value. The findings highlight the significant impact of factors such as contingency reserve allocation policies, operational interruptions, and project risk correlations on portfolio decisions, constituting a helpful framework for the decision-makers at portfolio level.

Tipo de documento

Artículo

Versión del documento

Versión publicada

Lengua

Inglés

Materias y palabras clave

Project portfolio management

Páginas

20 p.

Publicado por

Elsevier Ltd.

Publicado en

Computers & Industrial Engineering

Citación recomendada

Esta citación se ha generado automáticamente.

Derechos

© L'autor/a

© L'autor/a

Attribution-NonCommercial-NoDerivatives 4.0 International

Este ítem aparece en la(s) siguiente(s) colección(ones)

Esade [289]