Para acceder a los documentos con el texto completo, por favor, siga el siguiente enlace: http://hdl.handle.net/2117/132665

Full Time Domain EMI Measurement system applied to Railway emissions according to IEC 62236-3-1/EN 50121-3-1 standards
Pous Solà, Marc; Azpúrua Auyanet, Barón Marco Aurelio; Oliva Sánchez, José Antonio; Aragon Homar, Marc; González García, Iván; Silva Martínez, Fernando
Universitat Politècnica de Catalunya. Departament d'Enginyeria Electrònica; Universitat Politècnica de Catalunya. IEB - Instrumentació Electrònica i Biomèdica
© 2018 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes,creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works.
This paper studies the advantages of applying time-domain based instrumentation to conduct electromagnetic interference emissions from rolling-stock. In IEC 62236-3-1 or EN 50121-3-1 standards, it is mandatory to measure the railway vehicle in static and in-motion conditions. When conventional frequency sweep instrumentation is employed, difficulties regarding ambient noise variation and the short-duration of worst-case emission modes take place. In Annex B of the standard, a test procedure is described to acquire the worst-case EMI, however, as it is explained at the paper the effective measured time at each frequency is only 0.08 ms in some frequency bands. Hence, multiple movements of the vehicle are needed increasing the uncertainty of the measured source and making difficult to distinguish vehicle EMI from background noise interference. To solve this problem, a Full-TDEMI measurement system is proposed with the availability to increase the effective measured time, reduced the ambient noise variation, the usage of multiple antennas at the same time and the possibility to discard transient interference that should not be evaluated. At the end of the paper, measurements carried out with the time-domain system are shown demonstrating the effectivity of the methodology. © 2018 IEEE.
Peer Reviewed
-Àrees temàtiques de la UPC::Enginyeria elèctrica
-Electromagnetic interference
-Electromagnetic interference
-Measuring receiver
-Railway
-Time domain measurements
-Acoustic noise
-Electromagnetic pulse
-Electromagnetic wave interference
-Railroad rolling stock
-Railroads
-Signal interference
-Testing
-Vehicles
-Measurement system
-Motion conditions
-Multiple antenna
-Railway emissions
-Time domain systems
-Transient interference
-Electromagnetic compatibility
-Interferència electromagnètica
Artículo - Versión presentada
Objeto de conferencia
Institute of Electrical and Electronics Engineers (IEEE)
         

Mostrar el registro completo del ítem

Documentos relacionados

Otros documentos del mismo autor/a

Oliva Sánchez, José Antonio; Azpúrua Auyanet, Barón Marco Aurelio; Pous Solà, Marc; Silva Martínez, Fernando; Baharuddin, M.H.; Smartt, C.; Thomas, D.W.P
Azpúrua Auyanet, Barón Marco Aurelio; Pous Solà, Marc; Silva Martínez, Fernando; Oliva Sánchez, José Antonio
Azpúrua Auyanet, Barón Marco Aurelio; Pous Solà, Marc; Silva Martínez, Fernando; Pinter, Borut; Hudlicka, Martin
Azpúrua Auyanet, Barón Marco Aurelio; Pous Solà, Marc; Silva Martínez, Fernando
Azpúrua Auyanet, Barón Marco Aurelio; Pous Solà, Marc; Cakir, S.; Silva Martínez, Fernando; Cetinta, M.