Growing electrical demand on the electric system along with the rising use of renewable energy sources is highlighting the importance of energy flexibility management on the electric grid. The Electric System Operators at both transmission (TSO) and distribution level (DSO) are responsible to ensure the security of supply and efficiency of the grid under strict balancing conditions (demand equals supply at every time instant). Acting on both generation and demand to maintain this equilibrium considering the technical constraints of the grid is known as flexibility management and it requires accurate generation and demand forecasting to predict possible critical events and react accordingly. The objective of this paper is to analyze the performance of different forecasting methods for predicting demand at the substation level. Substation level data is the result of aggregating the consumption and generation data of multiple points on the grid. Results show that current state of the art algorithms, such as deep learning models, perform better than simpler methods, such as random forests, specially when datasets do not present clearly repetitive profiles. Deep learning models manage to reduce forecasting error by 16% on average compared to random forest models on next day load forecasting, whereas the forecasting error reduction on next hour load forecasting is 5%


The FEVER project - Flexible Energy Production, Demand and Storage-based Virtual Power Plants for Electricity Markets and Resilient DSO Operation - is acknowledged by contributing with the data used in this work. FEVER was funded by the European Union (grant agreement N°864537)


The THERMO-X (Tecniospring INDUSTRY ACE026/21/000080) project has received funding from the European Union's Horizon 2020 research and innovation programme under Marie Skłodowska-Curie grant agreement No. 801342 (Tecniospring INDUSTRY) and the Government of Catalonia's Agency for Business Competitiveness (ACCIÓ)


7

Tipo de documento

Artículo


Versión publicada


peer-reviewed

Lengua

Inglés

Publicado por

IOS Press

Documentos relacionados

info:eu-repo/semantics/altIdentifier/doi/10.3233/FAIA240442

info:eu-repo/semantics/altIdentifier/issn/0922-6389

info:eu-repo/semantics/altIdentifier/isbn/978-1-64368-543-4

info:eu-repo/semantics/altIdentifier/eissn/1879-8314

info:eu-repo/grantAgreement/EC/H2020/864537/EU/Flexible Energy Production, Demand and Storage-based Virtual Power Plants for Electricity Markets and Resilient DSO Operation/FEVER

info:eu-repo/grantAgreement/EC/H2020/801342/EU/ACCIÓ programme to foster mobility of researchers with a focus in applied research and technology transfer/TECNIOspringINDUSTRY

Citación recomendada

Esta citación se ha generado automáticamente.

Derechos

Attribution-NonCommercial 4.0 International

http://creativecommons.org/licenses/by-nc/4.0/

Este ítem aparece en la(s) siguiente(s) colección(ones)