A simheuristic algorithm for solving an integrated resource allocation and scheduling problem

dc.contributor
Macarrone, Ludovica
dc.contributor
Giovannelli, Tommaso
dc.contributor
Ferone, Daniele
dc.contributor
Panadero Martínez, Javier
dc.contributor
Juan Pérez, Ángel Alejandro
dc.date
2019-07-22T09:01:22Z
dc.date
2019-07-22T09:01:22Z
dc.date
2019-01-02
dc.identifier.citation
Macarrone, L., Giovannelli, T., Ferone, D., Panadero, J. & Juan, A.A. (2019). A simheuristic algorithm for solving an integrated resource allocation and scheduling problem. Winter Simulation Conference (WSC). Proceedings, Dec. - Jan.(), 3340-3351. doi: 10.1109/WSC.2018.8632296
dc.identifier.citation
0891-7736
dc.identifier.citation
10.1109/wsc.2018.8632296
dc.identifier.uri
http://hdl.handle.net/10609/99606
dc.description.abstract
Modern companies have to face challenging configuration issues in their manufacturing chains. One of these challenges is related to the integrated allocation and scheduling of resources such as machines, workers, energy, etc. These integrated optimization problems are difficult to solve, but they can be even more challenging when real-life uncertainty is considered. In this paper, we study an integrated allocation and scheduling optimization problem with stochastic processing times. A simheuristic algorithm is proposed in order to effectively solve this integrated and stochastic problem. Our approach relies on the hybridization of simulation with a metaheuristic to deal with the stochastic version of the allocation-scheduling problem. A series of numerical experiments contribute to illustrate the efficiency of our methodology as well as their potential applications in real-life enterprise settings.
dc.format
application/pdf
dc.language.iso
eng
dc.publisher
Winter Simulation Conference (WSC). Proceedings
dc.relation
https://www.informs-sim.org/wsc18papers/includes/files/296.pdf
dc.rights
(c) Journal
dc.rights
info:eu-repo/semantics/restrictedAccess
dc.subject
Producción - Planificación
dc.subject
Production planning
dc.subject
Producció - Planificació
dc.title
A simheuristic algorithm for solving an integrated resource allocation and scheduling problem
dc.type
info:eu-repo/semantics/publishedVersion
dc.type
info:eu-repo/semantics/workingPaper


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Articles [361]