dc.description.abstract
The goal of process planning is to propose the routing of a previously designed part and results in a sequence of operations and their parameters. It concerns and requires detailed information about the process. The goal of production planning, on the other hand, is to schedule, sequence and launch the orders introduced on the routing sheet into the job-shop according to the enterprise's strategic goal and the actual conditions of the production plant. The goals, information and decisions taken in process planning and production planning and control are often very different and, because of that, it is very difficult to integrate them. The objective of this work is to develop a model that can be applied in the future to the development of an integrated process planning and scheduling tool using an integrated definition (IDEF) methodology to design an activity model, which integrates process and production planning in metal removal processes. An activity model will be used to develop a system that allows the user to plan the process and the production at the same time in collaborative engineering work. To design the activity model, a wide range of parts were evaluated and processed in an actual job-shop factory. Several activities were developed in detail to be tested in real cases, and an example of one of them is introduced in this article
dc.description.abstract
The project was developed with the DPI2003-0561 reference grant awarded by the Spanish government
dc.format
application/pdf
dc.relation
info:eu-repo/semantics/altIdentifier/doi/10.1016/j.rcim.2007.07.013
dc.relation
info:eu-repo/semantics/altIdentifier/issn/0736-5845
dc.relation
info:eu-repo/semantics/altIdentifier/eissn/1879-2537
dc.rights
Attribution-NonCommercial-NoDerivatives 4.0 International
dc.rights
http://creativecommons.org/licenses/by-nc-nd/4.0/
dc.rights
info:eu-repo/semantics/openAccess
dc.source
© Robotics and Computer-Integrated Manufacturing, 2008, vol. 24, núm. 4, p. 532-544
dc.source
Articles publicats (D-EMCI)
dc.subject
Producció -- Planificació
dc.subject
Production planning
dc.subject
Producció -- Control
dc.subject
Production control
dc.subject
Fabricació -- Automatització
dc.subject
Manufacturing processes -- Automation
dc.title
A model for integrating process planning and production planning and control in machining processes
dc.type
info:eu-repo/semantics/article
dc.type
info:eu-repo/semantics/acceptedVersion