To access the full text documents, please follow this link: http://hdl.handle.net/2099.1/16877
Title:
|
Improved logistics of an assembly line
|
Author:
|
Putin Burgos, Carlos
|
Other authors:
|
Portioli, Alberto |
Abstract:
|
This project has been developed in the plant of Mangeti Marelli SPA. in Corbetta (Milano). It is based on the improvement of a final assembly line from the logistic point of view. In order to reduce the stock volume in the plant and to obtain a blanced production with the custumers Takt.time synchronyzing the income material with the outcome final product. It is divided in three parts:-Magnet Marelli Spa. description. -World Class Mnufacturing system description and Lean Manufacturing concepts. - Project development |
Abstract:
|
Outgoing |
Subject(s):
|
-Àrees temàtiques de la UPC::Economia i organització d'empreses::Direcció d'operacions::Anàlisi de processos de negoci i de fabricació -Assembly-line methods -- Planning -Industrial efficiency -Production management -Treball en cadena -- Planificació -Eficiència industrial -Producció -- Direcció i administració |
Rights:
|
|
Document type:
|
Bachelor Thesis |
Published by:
|
Universitat Politècnica de Catalunya; Politecnico di Milano
|
Share:
|
|
Show full item record