<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-04-13T01:14:57Z</responseDate><request verb="GetRecord" identifier="oai:www.recercat.cat:2117/173978" metadataPrefix="qdc">https://recercat.cat/oai/request</request><GetRecord><record><header><identifier>oai:recercat.cat:2117/173978</identifier><datestamp>2025-07-23T06:45:37Z</datestamp><setSpec>com_2072_1033</setSpec><setSpec>col_2072_452951</setSpec></header><metadata><qdc:qualifieddc xmlns:qdc="http://dspace.org/qualifieddc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:dcterms="http://purl.org/dc/terms/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://purl.org/dc/elements/1.1/ http://dublincore.org/schemas/xmls/qdc/2006/01/06/dc.xsd http://purl.org/dc/terms/ http://dublincore.org/schemas/xmls/qdc/2006/01/06/dcterms.xsd http://dspace.org/qualifieddc/ http://www.ukoln.ac.uk/metadata/dcmi/xmlschema/qualifieddc.xsd">
   <dc:title>Root cause analysis and process improvement of a nasal spray</dc:title>
   <dc:creator>Mozota Martínez, Aina</dc:creator>
   <dc:subject>Àrees temàtiques de la UPC::Enginyeria mecànica</dc:subject>
   <dc:subject>Machine design</dc:subject>
   <dc:subject>Maquinària -- Disseny</dc:subject>
   <dcterms:abstract>The following project has been developed in a pharmaceutical industrial environment at Merck,&#xd;
Darmstadt, specifically in the production and packaging of a nasal spray, which takes place at FAMAR,&#xd;
in Alcorcón. After receiving multiple complaints in which it was described that the product was open&#xd;
and its content spilled, Merck decided to perform a root-cause analysis of the aforementioned problem&#xd;
and to implement a CAPA plan in order to fix it, which consists in the implementation of a set of&#xd;
preventive and corrective measures, and at the same time, to improve the functioning of the&#xd;
production line by acting upon the deficiencies found in the analysis.&#xd;
The methodology followed to find the root of the problem has been a root cause analysis employing&#xd;
many analysis methods. First of all, a risk assessment of this type of incident has been done, as well as&#xd;
an exhaustive investigation of the process that the product takes in the production and the assurance&#xd;
of the Good Manufacturing Practices (GMP) and a study of the defective samples and the comparison&#xd;
against the retain samples. Concomitantly, a 6M (Ishikawa diagram) study has been developed in order&#xd;
to determine which factors have had an influence on the result and which have not and the data of the&#xd;
batches produced has been reviewed, including those batches with and without defective samples.&#xd;
Lastly, an identical case has been studied and an investigation action has been implemented.&#xd;
A sole root cause could not be found, however many contributing factors have been found, which has&#xd;
allowed, on one hand, to come up with corrective actions and implement them to fix the problem, and&#xd;
on the other hand, to reach preventive actions in order to avoid similar cases in the future, and once&#xd;
the weak spots and lacks of the production line were revealed, improve upon them.&#xd;
An environmental study can also be found in this project, where the impact of the development of the&#xd;
project upon the environment has been evaluated, taking into account the type of material that is used&#xd;
to package the product as well as the reagent employed to synthetize the product and its risks, and&#xd;
finally the carbon footprint that meant performing the project, analysing among other things, the&#xd;
energy consumed and the pollution created.&#xd;
Finally, an economical study of the cost of the project has been done. In this analysis, the costs of the&#xd;
used materials, products, power consumption, human resources and lastly the cost of the visits to the&#xd;
production site have been estimated.</dcterms:abstract>
   <dcterms:abstract>Outgoing</dcterms:abstract>
   <dcterms:issued>2018-10-23</dcterms:issued>
   <dc:type>Bachelor thesis</dc:type>
   <dc:rights>Restricted access - author's decision</dc:rights>
   <dc:publisher>Universitat Politècnica de Catalunya</dc:publisher>
</qdc:qualifieddc></metadata></record></GetRecord></OAI-PMH>